Steering Committee Meetings
- 26th Steering Committee Meeting (Kathmandu)
- Administration
- Discussion Papers (DPs) and Information Papers (IPs)
- R DP1 – 26th SCM Actions Taken from 25th Decisions
- DP2 – Phase IV Programme Progress Report
- DP-3 Safety Team Reporting
- Appendix I – 19th RoC 2017
- Appendix II A Bangladesh SARAST SAFETY TOOL IMPLEMENTATION
- Appendix II B BHUTAN SAFETY TOOL TRACKER UPDTAED AS OF 16 SEP 2016
- Appendix II C Implementation Tracker 25052016 Pakistan
- Appendix II D India SARAST Tracker
- Appendix II E Maldives REV Appendix II – SARAST SAFETY TOOL IMPLEMENTATION
- Appendix II F Nepal – SARAST SAFETY TOOL IMPLEMENTATION TRACKER
- Appendix II G Sri Lanka Appendix II – SARAST SAFETY TOOL IMPLEMENTATION – with D…
- Appendix III – A 8 – Model Advisory FDAP – SEI CFIT4
- Appendix III B 14 – SEI LOC1 CFIT2_Model AC – SOP for Flight Deck Crew members
- Appendix III C 16 – Standardised Capacity Building Programme v11 2107
- Appendix III D Model AC on Runway Incursion Prevention and Pilot Training [RI2]
- Appendix IV – DP3 Pakistan APRAST11 WP-14 AI_6 – [PAK] Runway Safety Programme
- R DP4 SC25_DP4_Work_Plan_vf copy (Corrected) copy
- R DP5 Contributions and Budget (2017) Draft_Final v1
- R Appendix 1 DP5 Contributions and Budget (2017) Draft_Final v1.2
- Appendix IA and IB DP5 Airbus and Boeing Contributions
- Appendix IC DP5 Contributions and Budget (2017) Draft_Final.3
- Appendix II DP5 Contributions and Budget (2017) Draft_Final.4
- RAS97902 201709 ICAO Financial Status Report 2017-10-17
- DP6 Status South Asia Capacity Building Matrices (SACBM)
- DP7 Intro to Phase V
- DP8 – Safety Management
- DP9 – GASP
- DP10 Runway Safety
- DP11 USOAP Update
- R DP12 – Discussion on Feasibility Study
- UPDATED DP13-5-DP13-RSOO-GASOS_COSCAP rev6
- IP1 ICAO update
- Other
- Record of Conclusions
- 25th Steering Committee Meeting (North Male Atoll)
- 20th Steering Committee Meeting (Colombo)
- Administration
- Discussion Papers (DPs) and Information Papers (IPs)
- Attachment 1 DP-03-20SCM Recommendations 11th SARAST
- Attachment 1 – Annual Work Programme 2011
- Attachment 2 DP-03-20SCM Recommendations
- Attachment 3 DP 20SCM-03 Record of actions 3rd ARAST
- Attachment 4 DP-20SCM-03 RECORD OF DISCUSSIONS 4th ARAST
- Attachment 5 DP-20SCM-03
- Attachments 01 for the DP-09
- Attachments 02 for the DP-09
- Cover Page
- DP 04 _Review of Recommendations of the 4th NC Meeting
- DP-01-Progress Review of COSCAP-SA
- DP-02 _Review of 19th SCM Decisions
- DP-03_Review of the recommendations of 12th SARAST 4th ARAST
- DP-04 Attachment 01 _4th NC Meeting Record of Discussions
- DP-08 _Review of AWP 2010 and Presentation of AWP 2011
- DP-09 _Programme Budget and Funding
- DP-10E – Attachment 01 Training of investigators
- DP-10E BEA training of investigators
- DP-11E _Status of Regulation Harmonization in South Asia
- DP05 Update ICAO USOAP Programme 2010
- DP06 Attachment 01 ICAO RASG
- DP06 RASG
- DP07- ICAO Safety Managment Systems and SSP
- Technical Missions in 2010
- Discussion Papers
- Other
- Record of Conclusions
- 19th Steering Committee Meeting (Bangkok)